STUDIOBalanced Flue Instructions for Use,Installation and ServicingFor use in GB, IE (Great Britain and Eire)PR0919 Issue 5 (January 2008)IMPORTANTDo
10INSTALLATION INSTRUCTIONSTECHNICAL SPECIFICATIONSteel Frame DimensionsDimension Studio 1 Studio 2A 1120 1350B 675 675C 646 846D 320 320E 177 177 F 2
11INSTALLATION INSTRUCTIONSSITE REQUIREMENTSNote: This appliance must only be installed with the flue supplied.You must adhere to the following: 1.1
12STUDIO 1 BF1AAR1671STUDIO 2 BF1AAR1971 Start of bend to centre line of horizontal flue 170mm. Centre line of vertical flue to end of bend 220mm.2.1
13INSTALLATION INSTRUCTIONSSITE REQUIREMENTS1CAR16732.3 TOP FLUE VERTICAL KIT (8524/8524AN) Vertical from the top of the appliance (See Diagram 1C).
14INSTALLATION INSTRUCTIONSSITE REQUIREMENTS/INSTALLATION5. APPLIANCE LOCATION5.1 Please note this appliance has been specifically designed for stud
15INSTALLATION INSTRUCTIONSINSTALLATION2AR1869access panel2 AR18883. STUD WORK INSTALLATION3.1 Combustible parts of the stud work must be kept beyon
16INSTALLATION INSTRUCTIONSINSTALLATION • Fitthesuppliedtopsupportbarintothestudworkatthecorrect height, Diagram 7, because no combusti
17INSTALLATION INSTRUCTIONSINSTALLATION13AR19053.3 STUD WORK INSTALLATION METHOD 2 (EDGE) Forthiscool-wallEdgeinstallation,theconvectedheato
18INSTALLATION INSTRUCTIONSINSTALLATION Studio 1 BF17Studio 2 BFStudio 1 & 2 BFAR1671, AR1971, AR1673 TAKE CARE WHEN MARKING OUT FOR THE FLUE AS
19INSTALLATION INSTRUCTIONSINSTALLATION4.6 Onlythehorizontalterminalsectioncanbereducedinsize.To find the length: • Measurefromtheouts
2COVERING THE FOLLOWING MODEL: STUDIO 1 BALANCED FLUE: STUDIO 2 BALANCED FLUE: 8700BFCHEC 8701BFCHEC
20INSTALLATION INSTRUCTIONSINSTALLATION • Offertheframetothefootoftheopening • Slidetheframetotherighttolocatetherighthingepin2
21INSTALLATION INSTRUCTIONSINSTALLATION • PresstheON-OFFbuttontolighttheappliance,(upto 30 seconds) • PresstheUPbuttontoincreas
22INSTALLATION INSTRUCTIONSCOMMISSIONING7. COMMISSIONING7.1 Complete the Commissioning Checklist at the front of this manual covering: • Fluecheck
23IGNITION FUNCTIONAL CHECK 1PILOTWILLNOTLIGHTEnsurethereisnodebrisaroundthepilotassembly, (e.g. soot, etc.) which could short the spark,
24PILOTWILLNOTSTAYLITORFIREGOESOUTINUSEEnsurethereisnodebrisaroundthepilotassembly,(e.g. soot etc.) Check for fluff in the pilot ae
3.2 To completely remove the glass front: • Removethesecuringspringclipfromthebottom-rightof the window frame, Diagram 33AR18623.3 With
26SERVICING INSTRUCTIONSREPLACING PARTS 4. GLASS WINDOW4.1 Remove the two clips and brackets from either side of the frame, Diagram 55AR1864 • Lift
279AR1868 • Slidetheburnertotherightandoutofitslocation • Refitinreverseorder Whenrefillingthestonepebbles,filltothelevelof
28SERVICING INSTRUCTIONSREPLACING PARTS8. PILOT UNIT ASSEMBLY8.1 The pilot assembly consists of four components which can be individually changed: 1
29SERVICING INSTRUCTIONSREPLACING PARTS10. GAS VALVE10.1 To change the gas valve: • Removethecontrolassembly,Section7 • Releasethegasinl
3FLUE CHECK PASS FAIL1. Flue is correct for appliance 2. Flue flow test N/A 3. Spillage test N/A GAS CHECK 1. Gas soundness & let by test2.
30SERVICING INSTRUCTIONSREPLACING PARTS13. MAIN INJECTOR13.1 To change the main injector: • Undotheinjectorfeepipe • Undothelocknutfromt
31SERVICING INSTRUCTIONSREPLACING PARTS15. SHORT SPARES LISTSTUDIO 1 BF STUDIO 2 BFCOMPONENT NG LPG NG LPGPILOTINJECTOR PI0069 PI0070 PI0069 PI00
32SERVICE RECORDS1ST SERVICEDate of Service:...Next Service Due:...
Gazco Limited, Osprey Road, Sowton Industrial Estate, Exeter, Devon, England EX2 7JGTel: (01392) 261999 Fax: (01392) 444148 E-mail: [email protected]
4USER INSTRUCTIONS 1. GENERAL1.1 A competent person must carry out installation and servicing.1.2 In all correspondence, please quote the appliance
5USER INSTRUCTIONS DECREASINGTEMPERATURE • PresstheDOWNarrowoncetodecreaseflameheight one stage • PressandholdtheDOWNarrowto
6USER INSTRUCTIONS • PresstheON-OFFbuttontoturntheapplianceoffEMERGENCY SHUT OFF If the batteries fail during use of the fire, move the swi
7USER INSTRUCTIONS5. ARRANGEMENT OF FUEL BED5.1 If you need to replace pebbles or refill the tray, make sure the pebbles are flattened so they are le
8Model Gas CAT.Gas TypeWorkingPressureAeration Injector Gas Ratem3/hInput kW (Gross) CountryHigh LowStudio 1 BF 12H Natural G2020mbar 16 x 23 400 0.60
9INSTALLATION INSTRUCTIONSTECHNICAL SPECIFICATIONThis appliance has been certified for use in countries other than those stated. To install this appli
Comments to this Manuals